Kyiv/Ukraine
Challenges. The release period is 3 months for a turnkey office of 500 sq. M.
Planning of space. The office space is basically an open space with one closed-plan office, two meeting rooms, a kitchen, bathrooms and two zoned blocks. One block is raised by +1 level.
Implementation. Comprehensive repair work at all stages, including field and technical supervision.
Materials. The materials used are decorative plaster, metal, concrete, glass, self-leveling floor, porcelain stoneware.